Skip to main content

My Little Trip to Yogyakarta Related to Project of The Year and Culinary Experience

Last week, I had a little trip to Yogyakarta related to this post. It was quite nice experience, despite of my role in this trip. Me and my team were supporting members of this meeting. If supplementary explanation is required, then we help.

This meeting was nice because I can witness how Plan of Development is prepared from A to Z and what was each topic about. Read More

Pre-FEED is My Second Project of The Year

Pre-FEED (Preliminary Front End Engineering Design) is my second project of the year. This is not the first time for me, especially Pre-FEED of oil and gas surface facility. However, the complexity is completely different from the previous one. I can say, this one is much more challenging.

The Pre-FEED I worked on is for Plan of Development (POD). Through POD, SKK Migas (Indonesia Special Task Force for Oil and Gas) along with KKKS (Cooperative Contract Contractor) are able to produce hydrocarbon reserve (which is national asset) very well, by considering both technical and commercial aspect, so that it will give benefit for Indonesia and fair benefit for KKKS.

How can Pre-FEED has something to do with POD? Read More